top of page

Pablosky Shoe factory, Toledo, 13,000m2
Toledo, Spain
Production plant
Objet
Taille
13,000 m2
Reason for application
Investor had problems with roof leaks. Many other solutions were applied on the roof without a satisfactory effect. In 2018, a part of the roof with an area of 7,000 m was renovated with COOL-R. Due to the good waterproofing results and reducing the temperature inside the building, another roof of the shoe factory was covered in 2019.
Type de surface
Aluminium sheet metal and bituminous membrane
État du toit
Problems with hydroinsulation (leaks)
Âge
30 years
Solution utilisée
COOL-R Waterproofing coating
Résultats
Lowering temperature inside the facility and elimination of leaks
bottom of page
